Installation Procedure
- Generator Control Module (2) - Install
- Generator Control Module Mounting Nut (1) - Install and tighten (Qty: 4) to 22 N.m (16 lb ft)
- Generator Control Module Coolant Outlet Hose (2) @ Generator Control Module - Engage - Generator Control Module Coolant Outlet Hose Replacement (Starter Generator to Generator Control Module L8B)
- Generator Control Module Coolant Tank Hose (2) @ Generator Control Module - Engage - Generator Control Module Coolant Tank Hose Replacement (Bottom L8B)Generator Control Module Coolant Tank Hose Replacement (Low Temp Radiator to Generator Control Module L8B)
- Battery Positive Junction Block Cable (4) - Install
- Battery Positive Junction Block Cable Nut (2) - Install and tighten to 9 N.m (80 lb in)
- Battery Distribution Engine Compartment Fuse Block Nut (3) - Install and tighten to 15 N.m (11 lb ft)
- Fuse Block Cover (1) - Install
- High Voltage Battery Pack Positive Cable Connector (2) - Connect
- Starter Generator High Voltage Cable Connector (3) - Connect
- Electrical Connector (4) - Connect
- Ground Terminal Fastener (1) - Install and tighten to 9 N.m (80 lb in)
- Front End Sheet Metal Diagonal Brace (3) - Install
- Retainer Clip (2) - Engage
- Front End Sheet Metal Diagonal Brace Bolt (1) - Install and tighten (Qty: 2) to 25 N.m (18 lb ft)
- Enable the high voltage system. High Voltage Enabling
CAUTION:
Refer to Fastener Caution
Fig 5: High Voltage Battery Pack Positive Cable, Starter Generator High Voltage Cable, Electrical Connector And Fastener