Installation Procedure
- Generator Control Module 3 Phase Cable (2) - Install
- Loosely install the generator control module 3 phase cable mounting bolts. (1)
- Loosely install the generator control module 3 phase cable terminal bolts. (1)
- Generator Control Module 3 Phase Cable Mounting Bolt (1) - Tighten to 9 N.m (80 lb in)
- Tighten the bolts in the sequence shown to 8 N.m (71 lb in)
- Terminal Cover Seal (2) - Install
- Dust Cover (1) - Install
- Cover (1) - Install
- Loosely install the cover bolts. (2)
- Heat Shield (1) - Install
- Loosely install the heat shield bolts. (2)
- Tighten the bolts in the sequence shown to 9 N.m (80 lb in)
- Starter Generator (1) - Install - Starter Generator Replacement
CAUTION:
Refer to Fastener Caution