On-Vehicle Inspection [02/2017 - ]: Procedure
- INSPECT EFI-MAIN NO. 1 RELAY (EFI-MAIN NO. 1)
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 3 - 5 Battery voltage not applied between terminals 1 and 2 10 kΩ or higher Battery voltage applied between terminals 1 and 2 Below 1 Ω If the result is not as specified, replace the EFI-main No. 1 relay (EFI-MAIN NO. 1).
- Measure the resistance according to the value(s) in the table below.
- INSPECT C/OPN RELAY (C/OPN)
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 3 - 5 Battery voltage not applied between terminals 1 and 2 10 kΩ or higher Battery voltage applied between terminals 1 and 2 Below 1 Ω If the result is not as specified, replace the C/OPN relay (C/OPN).
- Measure the resistance according to the value(s) in the table below.