Inspection Procedure
- PERFORM ACTIVE TEST USING TECHSTREAM
- Connect a Techstream to the DLC3.
- Turn the ignition switch ON.
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Combination Meter / Active Test.
- Check the CRUISE main indicator light by performing the Active Test.ACTIVE TEST
Tester Display Test Part Control Range Diagnostic Note Indicat. Lamp Cruise CRUISE main indicator light Indicator light BLINK/OFF - OK:
The indicator light blinks/goes off.
Result:
TEST RESULTResult Proceed to OK A NG (for Sedan) B NG (for Hatchback) C B: REPLACE COMBINATION METER ASSEMBLY (See REMOVAL )
C: REPLACE COMBINATION METER ASSEMBLY (See REMOVAL
A: GO TO NEXT STEP
- READ VALUE USING TECHSTREAM
- Connect a Techstream to the DLC3.
- Turn the ignition switch ON.
- Turn the Techstream on.
- Enter the following menus: Powertrain / Cruise Control / Data List.
- Check the Data List for proper functioning of the CRUISE main indicator light..ECM (CRUISE CONTROL)
Tester Display Measurement Item/Range Normal Condition Diagnostic Note CCS Indicator M-CPU Cruise indicator signal (Main CPU) / ON or OFF ON: "CRUISE" on
OFF: "CRUISE" off- OK: When the cruise control main switch is operated, the display changes as shown above.
NG: REPLACE ECM (See REMOVAL )
OK: PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (See PROBLEM SYMPTOMS TABLE )