Inspection Procedure
- PERFORM ACTIVE TEST USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the ignition switch to the ON position.
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Combination Meter / Active Test.
- Check the CRUISE main indicator light by performing the Active Test.
Combination Meter:
METER - ACTIVE TEST LISTTester Display Test Part Control Range Indicat. Lamp Cruise Cruise main indicator light BLINK /OFF OK: Indicator light blinks/goes off.
NG: REPLACE COMBINATION METER ASSEMBLY (See REMOVAL )
OK: Go to next step.
- READ VALUE USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the ignition switch to the ON position.
- Turn the Techstream on.
- Emter the following menus: Powertrain / Laser Control / Data List.
- Check the Data List for proper functioning of the CRUISE main indicator light.
ECM (Cruise control):
ECM (CRUISE CONTROL) - DATA LISTTester Display Measurement Item/Range Normal Condition Diagnostic Note CCS Ready M-CPU Cruise control system standby condition (Main CPU) / ON or OFF Each time main switch is pushed, ON/OFF changes "1" CCS Indicator M-CPU Cruise indicator signal (Main CPU) / ON or OFF ON: "CRUISE" ON
OFF: "CRUISE" OFF"2" OK: When the cruise control main switch is operated, the display changes as shown above.
HINT:
"1" is OK, but "2" is NG → DTC output or ECM failure
NG: REPLACE ECM (See REMOVAL )
OK: PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE