Inspection Procedure
NOTE:
When replacing the VSC actuator assembly, perform the zero point calibration (See CALIBRATION
).
- CHECK TERMINAL VOLTAGE (STOP LIGHT CONTROL RELAY)
- Remove the stop light control relays from the engine room relay block.
- Turn the ignition switch to ON.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
VOLTAGE SPECIFICATIONTester Connection Switch Condition Specified Condition Stop light control relay terminal 1 (BRK NO. 1)-Body ground Ignition switch ON 11 to 14 V Stop light control relay terminal 1 (BRK NO. 2) - Body ground
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to Next Step
- INSPECT STOP LIGHT CONTROL RELAY (BRK NO. 1, BRK NO. 2)
- Remove the stop light control relays (BRK NO. 1 and BRK NO. 2) from the engine room relay block.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
for BRK NO. 1
RESISTANCE REFERENCETester Connection Switch Condition Specified Condition 3 - 4 When battery voltage is not applied to terminals land 2 Below 1 Ω 3 - 5 When battery voltage is not applied to terminals land 2 10 kΩ or higher 3 - 4 When battery voltage is applied to terminals 1 and 2 10 kΩ or higher 3 - 5 When battery voltage is applied to terminals 1 and 2 Below 1 Ω for BRK NO. 2
VOLTAGE SPECIFICATIONTester Connection Switch Condition Specified Condition 3 - 4 When battery voltage is not applied to terminals land 2 Below 1 Ω When battery voltage is applied to terminals 1 and 2 10 kΩ or higher
NG: REPLACE STOP LIGHT CONTROL RELAY
OK: Go to Next Step
- CHECK HARNESS AND CONNECTOR (ENGINE ROOM RELAY BLOCK - SKID CONTROL ECU)
- Disconnect the A19 ECU connector.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
VOLTAGE SPECIFICATIONTester Connection Switch Condition Specified Condition A19-35 (BSW) - Body ground Ignition switch ON 11 to 14 V
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE VSC ACTUATOR ASSEMBLY (See REMOVAL )