COMPRESSOR AND MAGNETIC CLUTCH (for 1ZZ-FE): Installation
- INSTALL COMPRESSOR AND MAGNETIC CLUTCH
- Install the compressor and magnetic clutch with the 3 bolts.
- Temporarily tighten bolt A.
HINT:
Do not over tighten the bolt until the compressor no longer moves.
- Push down on the rear side of the compressor and fully tighten bolt B, bolt C and bolt A in order.
Torque: 24.5 N*m (250 kgf*cm, 18 ft.*lbf)
- Connect the connector.
- INSTALL DISCHARGE HOSE SUB-ASSEMBLY
- Remove the attached vinyl tape from the hose.
- Sufficiently apply compressor oil to the new O-ring and fit surface of the compressor and magnetic clutch.
Compressor oil: ND-OIL8 or equivalent
- Install an O-ring to the discharge hose sub-assembly.
- Install the discharge hose sub-assembly to the compressor and magnetic clutch with the bolt.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- INSTALL SUCTION HOSE SUB-ASSEMBLY
- Remove the attached vinyl tape from the hose.
- Sufficiently apply compressor oil to the new O-ring and fit surface of the compressor and magnetic clutch.
Compressor oil: ND-OIL8 or equivalent
- Install an O-ring to the cooler refrigerant suction hose No. 1.
- Install the cooler refrigerant suction hose No. 1 to the compressor and magnetic clutch with the bolt.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- CHARGE REFRIGERANT (See REFRIGERANT LINE )
- WARM UP ENGINE
- INSPECT LEAKAGE OF REFRIGERANT (See REFRIGERANT LINE )