Pressure Switch: Installation
- INSTALL PRESSURE SWITCH
- Coat a new O-ring with compressor oil.
- Install the pressure switch to the liquid tube.
Torque: 9.8 N.m (100 kgf.cm, 87 in.lbf)
- CHARGE REFRIGERANT TO REFRIGERANT SYSTEM (See CHARGING
)
- Evacuate air from the refrigeration system.
- Charge system with refrigerant and inspect for leakage of refrigerant.
Specified amount: 500 +/- 50 g (17.64 +/- 1.76 oz.)