Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Suzuki >> 2012 >> Equator RMZ-4 >> Repair and Diagnosis >> Electrical >> Charging Systems >> Diagnostic Information and Procedures >> Charging System Preliminary Inspection

Charging System Preliminary Inspection

DIAGNOSIS PROCEDURE

Step Action YES NO
1  CHECK BATTERY TERMINALS CONNECTION 
Check if battery terminals are clean and tight.
Is the inspection result normal? 
GO TO 2 Repair battery terminals connection.
2  CHECK FUSE 
Check for blown fuse and fusible link.
G00534182

Is the inspection result normal? 
GO TO 3 Be sure to eliminate cause of malfunction before installing new fuse or fusible link.
3  CHECK GENERATOR GROUND TERMINAL CONNECTION 
Verify connector E209 terminal 5 (generator ground harness) is clean and tight.
Is the inspection result normal? 
GO TO 4 Repair connection.
4  CHECK DRIVE BELT TENSION 
Check drive belt tension. Refer to [CHECKING DRIVE BELTS ] (QR25DE) or [CHECKING DRIVE BELTS ] (VQ40DE).
Is the inspection result normal? 
Inspection End. Repair as needed.