Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Subaru >> 2025 >> Impreza Base >> Repair and Diagnosis >> Engine Performance >> Fuel Delivery >> Emission Control Systems (Aux. Emission Control Devices) >> PCV Valve >> Installation

PCV Valve: Installation

  1. Apply liquid gasket to the bolt threads of PCV valve, and install the PCV valve onto the cylinder block RH.
    NOTE: Before applying liquid gasket, degrease bolt threads of PCV valve and the mating surface of the cylinder block RH.

    Preparation items  :

    Liquid gasket: THREE BOND 1217G (part No. K0877Y0100), THREE BOND 1217H or equivalent 

    Tightening torque  :

    23 N.m (2.3 kgf-m, 17.0 ft-lb) 

  2. Connect the PCV hose No. 1. Ref. to EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES) (H4DO)>PCV HOSE>INSTALLATION>PCV HOSE NO. 1 .
  3. Install the air intake boot. Ref. to INTAKE (INDUCTION) (H4DO)>AIR INTAKE BOOT>INSTALLATION .