PCV Connector: Installation
- By using new O-rings, install the PCV connector, and connect the water hose and PCV hose No. 2.
Tightening torque:
6.4 N.m (0.7 kgf-m, 4.7 ft-lb)
- Install the A/C compressor.
Refer to AIR CONDITIONER>COMPRESSOR>INSTALLATION .
- Install the V-belts.
Refer to MECHANICAL (H4DO)>V-BELT>INSTALLATION>V-BELT .
- Secure the battery cable assembly with the clip (A) and clip (B).
- Connect the connector (C), connector (D), and the terminal (E).
Tightening torque:
15.5 N.m (1.6 kfg-m, 11.4 ft-lb)
- Install the collector cover.
Refer to INTAKE (INDUCTION) (H4DO)>COLLECTOR COVER>INSTALLATION .
- Connect the ground terminal to battery sensor.
Refer to REPAIR CONTENTS>NOTE>BATTERY .
- Fill engine coolant.
Refer to COOLING (H4DO)>ENGINE COOLANT>REPLACEMENT>FILLING OF ENGINE COOLANT .
- Check refrigerant leaks.
Refer to AIR CONDITIONER>REFRIGERANT LEAK CHECK>INSPECTION .