Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Subaru >> 2019 >> Crosstrek Base, Automatic CVT Trans >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System (Diagnostics) (Except For HEV) (3 Of 4) >> Diagnostic Procedure With Diagnostic Trouble Code (DTC) >> DTC P2012: TGV Control Circuit Low Bank 2 >> Notes

DTC P2012: TGV Control Circuit Low Bank 2: Notes

  1. DTC detecting condition: 

    Immediately at fault recognition

    Wiring diagram: 

    Engine Electrical System Refer to WIRING SYSTEM (IMPREZA MODEL)>ENGINE ELECTRICAL SYSTEM>WIRING DIAGRAM . Refer to WIRING SYSTEM (CROSSTREK MODEL (EXCEPT FOR HEV))>ENGINE ELECTRICAL SYSTEM>WIRING DIAGRAM .

    G12400148Courtesy of SUBARU OF AMERICA, INC.
    CAUTION: Use the check board when measuring the ECM terminal voltage and resistance. Refer to ENGINE (DIAGNOSTICS) (H4DO (EXCEPT FOR HEV))>General Description>PREPARATION TOOL>HOW TO USE CHECK BOARD .
    NOTE: After the faulty parts are repaired or replaced, perform the final check in Basic Diagnostic Procedure. Refer to ENGINE (DIAGNOSTICS) (H4DO (EXCEPT FOR HEV))>BASIC DIAGNOSTIC PROCEDURE>PROCEDURE .
  1. CHECK HARNESS BETWEEN ECM AND TUMBLE GENERATOR VALVE ACTUATOR LH (SHORT TO POWER SUPPLY)  .
    1. Turn the ignition switch to OFF.
    2. Disconnect the connector from ECM.
    3. Measure the voltage between ECM connector and chassis ground.

      Connector & terminal 

      (E158) No. 101 (+) - Chassis ground (-):

      (E158) No. 110 (+) - Chassis ground (-):

      Is the voltage 5 V or more?

      Yes: 

      Repair the short circuit to power in harness between ECM connector and tumble generator valve actuator LH connector.

      No: 

      Replace the tumble generator valve actuator LH. Refer to FUEL INJECTION (FUEL SYSTEMS) (H4DO (EXCEPT FOR HEV))>TUMBLE GENERATOR VALVE ACTUATOR .

      NOTE: The tumble generator valve actuator cannot be disassembled.