Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Saturn >> 2006 >> Relay 3.5 L, AWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions >> Generator Replacement (RPO LX9) >> Installation Procedure

Installation Procedure

    Fig 1: Removing Generator Mounting Nuts And Bolts (3.5L)
    GM1239071Courtesy of GENERAL MOTORS CORP.
  1. Install the generator.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the generator mounting bolts.

    Tighten:  Tighten the bolts to 50 N.m (37 lb ft).

  4. Fig 2: Disconnecting/Reconnecting Generator Battery Positive Terminal
    GM1544748Courtesy of GENERAL MOTORS CORP.
  5. Install the terminal and generator battery positive nut (1).

    Tighten:  Tighten the nut to 30 N.m (22 lb ft).

  6. Connect the regulator electrical connector (2).
  7. Install the drive belt. Refer to Drive Belt Replacement in Engine Mechanical - 3.5L.
  8. Position the engine into the normal location and install the engine mount strut bolts. Refer to Engine Mount Strut Replacement - Left Side and Engine Mount Strut Replacement - Right Side in Engine Mechanical - 3.5L.
  9. Install the wiper motor module. Refer to Windshield Wiper System Module Replacement in Wipers/Washer Systems.
  10. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .