Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Saab >> 2000 >> 9-3 Base, 2D Convertible, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 4 (Engine Controls - Removal & Installation) >> Introduction >> Battery Disconnect Precautions & Relearn Procedures >> Driveability

Battery Disconnect Precautions & Relearn Procedures: Driveability

WARNING: This page is about a different car, the 2000 Volvo V40 and 2000 Volvo S40. However, it is still accessible from the selected car via links, so may be relevant.

When ignition has been switched off, wait at least 5 minutes before cutting power to the car. This is so there is sufficient time for information to be stored in the ECM.

When battery has been disconnected, vehicle may have to be driven for a few minutes before the engine runs normally. Some engine related Diagnostic Trouble Codes (DTCs) may be set. Clear as necessary using scan tool.