Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Pontiac >> 2009 >> Torrent Base, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 203 (Engine Control System & Fuel System - 6.6L LMM - Introduction) >> Repair Instructions >> Exhaust Gas Recirculation Valve Replacement >> Installation Procedure

Installation Procedure

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2009 GMC Savana Special, 2009 GMC Savana Camper Special, 2009 GMC Savana, 2009 Chevrolet RV Cutaway, and 2009 Chevrolet Cutaway. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: Identifying EGR Bracket Bolt, Nut, And EGR Bracket
    GM1731887Courtesy of GENERAL MOTORS CORP.
    CAUTION: Refer to Fastener Caution .
  1. If required, install the EGR bracket, the EGR bracket bolt, and nut. Tighten the bolt and nut to 25 N.m (18 lb ft).
  2. Fig 2: Identifying EGR Valve (3) & EGR Cooler Tube Bolts
    GM1862364Courtesy of GENERAL MOTORS CORP.

    Install NEW intake manifold tube gaskets (1) as required.
  3. Position the EGR valve (3) to the EGR cooler tube (4).
  4. Install the EGR valve to EGR cooler tube bolts (2) and tighten to 20 N.m (15 lb ft).
  5. Install the EGR valve/cooler. Refer to Exhaust Gas Recirculation Valve Cooler Replacement .
  6. Fill the cooling system. Refer to Cooling System Draining and Filling (Static Fill) or Cooling System Draining and Filling (Vac N Fill) .