Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Pontiac >> 2001 >> Aztek Base, FWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1637 (Battery, Charging System And Starting System) >> Diagnostic Information and Procedures >> DTC C0900 >> Circuit/System Verification

Circuit/System Verification

WARNING: This page is about a different car, the 2009 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
  1. Engine running, accessories OFF, measure and record the battery voltage at the battery terminals. The voltage should be between 12.6 and 15.0 V.
  2. Observe the scan tool EBCM Battery Voltage Signal parameter. The reading should be between 12.6 and 15.0 Volts.
    • If greater than the specified range, replace the EBCM.