Overall Function Check
Use this procedure to check the overall function of the park/neutral position (PNP) signal circuit. During this check, a 1st trip DTC might not be confirmed.
With GST
- Turn ignition switch ON.
- Check voltage between ECM terminal 14 (PNP signal) and ground under the following conditions.
Condition (Shift lever) Voltage (Known-good data) P or N position (CVT)
Neutral position (M/T)Battery voltage (11 - 14 V) Except above Approx. 0 - If NG, go to "DIAGNOSIS PROCEDURE ".