Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Nissan-Datsun >> 2011 >> Murano SL, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 55 (Engine Control System - Introduction (VQ35DE) (CROSSCABRIOLET)) >> Basic Inspection >> Additional Service When Replacing ECM >> Work Procedure

Work Procedure

WARNING: This page is about a different variant/trim than selected.
  1. PERFORM INITIALIZATION OF NVIS (NATS) SYSTEM AND REGISTRATION OF ALL NVIS (NATS) IGNITION KEY IDS

    Refer to , "ECM : WORK PROCEDURE ".

    GO TO 2.

  2. PERFORM VIN REGISTRATION

    Refer to "WORK PROCEDURE ".

    GO TO 3.

  3. PERFORM ACCELERATOR PEDAL RELEASED POSITION LEARNING

    Refer to "WORK PROCEDURE ".

    GO TO 4.

  4. PERFORM THROTTLE VALVE CLOSED POSITION LEARNING

    Refer to "WORK PROCEDURE ".

    GO TO 5.

  5. PERFORM IDLE AIR VOLUME LEARNING

    Refer to "WORK PROCEDURE ".

    END