Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Nissan-Datsun >> 2009 >> 370Z Base, Standard >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - DTCS U0101 Through P0153 >> P0011, P0021 IVT Control >> Component Inspection

Component Inspection

  1. CHECK INTAKE VALVE TIMING CONTROL SOLENOID VALVE-I
    1. Turn ignition switch OFF.
    2. Disconnect intake valve timing control solenoid valve harness connector.
    3. Check resistance between intake valve timing control solenoid valve terminals as follows.
      TERMINALS RESISTANCE REFERENCE

      Terminals Resistance (Ω)
      1 and 2 7.0 - 7.7 [at 20°C (68°F)]
      1 or 2 and ground ∞ (Continuity should not exist)

      Is the inspection result normal? 

      YES: GO TO 2.

      NO: Replace malfunctioning intake valve timing control solenoid valve.

  2. CHECK INTAKE VALVE TIMING CONTROL SOLENOID VALVE-II
    1. Remove intake valve timing control solenoid valve.
    2. Provide 12 V DC between intake valve timing control solenoid valve terminals 1 and 2, and then interrupt it. Make sure that the plunger moves as shown in the figure.
      CAUTION: Do not apply 12 V DC continuously for 5 seconds or more. Doing so may result in damage to the coil in intake valve timing control solenoid valve.
      Fig 1: Identifying Intake Valve Timing Control Solenoid Valve
      G04886474Courtesy of NISSAN MOTOR CO., U.S.A.
      NOTE: Always replace O-ring when intake valve timing control solenoid valve is removed.

      Is the inspection result normal? 

      YES: INSPECTION END

      NO: Replace malfunctioning intake valve timing control solenoid valve.