Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Nissan-Datsun >> 2008 >> Sentra Base, Standard >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System - DTCS U1000 To P0171 (MR20DE) >> DTC P0011 IVT Control >> Component Inspection >> Intake Valve Timing Control Solenoid Valve

Intake Valve Timing Control Solenoid Valve

  1. Disconnect intake valve timing control solenoid valve harness connector.
  2. Check resistance between intake valve timing control solenoid valve as follows.
    TERMINAL RESISTANCE CHART

    Terminal Resistance
    1 and 2 6.7 - 7.7Ω [at 20°C (68°F)]
    1 or 2 and ground ∞ Ω (Continuity should not exist.)

    If NG, replace intake valve timing control solenoid valve.

    If OK, go to next step.

    Fig 1: Checking Resistance Between Intake Valve Timing Control Solenoid Valve Terminals
    G04925201Courtesy of NISSAN MOTOR CO., U.S.A.
  3. Remove intake valve timing control solenoid valve.
  4. Provide 12V DC between intake valve timing control solenoid valve terminals and then interrupt it. Make sure that the plunger moves as shown in the figure.
    CAUTION: Do not apply 12V DC continuously for 5 seconds or more. Doing so may result in damage to the coil in intake valve timing control solenoid valve.

    If NG, replace intake valve timing control solenoid valve.

    NOTE: Always replace O-ring when intake valve timing control solenoid valve is removed.
    Fig 2: Applying 12V DC Between Intake Valve Timing Control Solenoid Valve Terminals
    G04925202Courtesy of NISSAN MOTOR CO., U.S.A.