Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Nissan-Datsun >> 2006 >> Altima SE-R, Standard >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - DTCS P0850 To P2A03 (VQ35DE) >> DTC P0850 PNP Switch >> Overall Function Check >> With GST

With GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    Fig 1: Checking Voltage Between ECM Terminal 102 And Ground
    G04167400Courtesy of NISSAN MOTOR CO., U.S.A.
    VOLTAGE SPECIFICATION

    Condition (Shift lever) Voltage (Known-good data)
    P or N position (A/T)
    Neutral position (M/T)
    Approx. 0V
    Except the above position BATTERY VOLTAGE (11 - 14V)
  3. If NG, go to , "DIAGNOSTIC PROCEDURE ".