Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Nissan-Datsun >> 2005 >> Sentra SE-R >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - DTCS U1000 To P0335 (Qr25DE) >> DTC P0011: IVT Control >> Component Inspection >> Intake Valve Timing Control Solenoid Valve

Intake Valve Timing Control Solenoid Valve

  1. Disconnect intake valve timing control solenoid valve harness connector.
  2. Check resistance between intake valve timing control solenoid valve as follows.
    Fig 1: Checking Resistance Between Intake Valve Timing Control Solenoid Valve Terminals
    G02450832Courtesy of NISSAN MOTOR CO., U.S.A.
    INTAKE VALVE TIMING CONTROL SOLENOID VALVE TERMINAL RESISTANCE SPECIFICATIONS

    Terminal Resistance
    1 and 2 8Ω [at 20°C (68°F)]
    1 or 2 and ground (Continuity should not exist.)
    1. If NG, replace intake valve timing control solenoid valve.
    2. If OK, go to next step.
  3. Remove intake valve timing control solenoid valve.
  4. Provide 12V DC between intake valve timing control solenoid valve terminals and then interrupt it. Make sure that the plunger moves as shown in Fig 2.
    Fig 2: Connecting 12V DC Between Intake Valve Timing Control Solenoid Valve Terminals
    G02450833Courtesy of NISSAN MOTOR CO., U.S.A.
    CAUTION: Do not apply 12V DC continuously for 5 seconds or more. Doing so may result in damage to the coil in intake valve timing control solenoid valve.

    If NG, replace intake valve timing control solenoid valve.

    NOTE: Always replace O-ring when intake valve timing control solenoid valve is removed.