Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Nissan-Datsun >> 2005 >> Altima SE-R, Standard >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (Engine Control System - Qr25DE) >> DTC P0011: IVT Control >> Component Inspection >> Intake Valve Timing Control Solenoid Valve

Intake Valve Timing Control Solenoid Valve

WARNING: This page is about a different variant/trim than selected.
  1. Disconnect intake valve timing control solenoid valve harness connector.
  2. Check resistance between intake valve timing control solenoid valve as follows.
    INTAKE VALVE TIMING CONTROL SOLENOID VALVE TERMINALS RESISTANCE

    Terminal Resistance
    1 and 2 7.0 - 7.7 Ω at 20°C (68°F)
    1 or 2 and ground (Continuity should not exist.)

    If NG, replace intake valve timing control solenoid valve.

    If OK, go to next step.

  3. Remove intake valve timing control solenoid valve.
    Fig 1: Checking Resistance Between Intake Valve Timing Control Solenoid Valve
    G02524864Courtesy of NISSAN MOTOR CO., U.S.A.
  4. Provide 12V DC between intake valve timing control solenoid valve terminals and then interrupt it. Make sure that the plunger moves as shown in the figure.
CAUTION: Do not apply 12V DC continuously for 5 seconds or more. Doing so may result in damage to the coil in intake valve timing control solenoid valve.

If NG, replace intake valve timing control solenoid valve.

NOTE: Always replace O-ring when intake valve timing control solenoid valve is removed.
Fig 2: Connecting 12V DC Between Intake Valve Timing Control Solenoid Valve Terminals
G02524865Courtesy of NISSAN MOTOR CO., U.S.A.