Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Nissan-Datsun >> 2004 >> Sentra SE-R >> Repair and Diagnosis >> External Pages >> Different car >> Section 2081 (Power Steering System) >> Power Steering Gear And Linkage >> Disassembly and Assembly >> Assembly

Disassembly and Assembly: Assembly

WARNING: This page is about a different car, the 2008 Nissan Maxima. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the inner tie-rod sockets.
  2. Install the outer tie-rod sockets to the specified length L and tighten the outer tie-rod socket lock nut to specification.
    NOTE: Use Genuine High Temperature, High Strength Thread Locking Sealant (Red) or equivalent. Refer to "RECOMMENDED CHEMICAL PRODUCTS AND SEALANTS ".
    Fig 1: Adjusting Inner Socket To Standard Length L
    G04876915Courtesy of NISSAN MOTOR CO., U.S.A.
  3. Measure rack stroke. Refer to "STEERING GEAR AND LINKAGE ".
    Fig 2: Identifying Rack Stroke
    G04906879Courtesy of NISSAN MOTOR CO., U.S.A.
  4. Before installing boot, coat the contact surfaces between boot and tie-rod socket with grease.
    Fig 3: Coating Contact Surfaces Between Boot And Tie-Rod Socket With Grease
    G04906880Courtesy of NISSAN MOTOR CO., U.S.A.
  5. Install the large boot clamp and crimp securely using Tool, then install the small boot clamp.

    Tool number: KV40107300 ( - ) 

    Fig 4: Identifying Large And Small Boot Clamps
    G04902323Courtesy of NISSAN MOTOR CO., U.S.A.