Power Supply and Ground Circuit Inspection
WARNING: This page is about a different car, the 2006 Nissan Titan. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK FUSES
Check for blown combination meter fuses.
FUSES TEST REFERENCEUnit Power source Fuse No. Combination meter Battery 19 Ignition switch ON or START 14 Ignition switch ACC or ON 4 Refer to "WIRING DIAGRAM - METER - ".
OK or NG
OK: GO TO 2.
NG: If fuse is blown, be sure to eliminate cause of malfunction before installing new fuse. Refer to "POWER SUPPLY ROUTING CIRCUIT ".
- CHECK POWER SUPPLY CIRCUIT
- Disconnect combination meter connector.
- Check voltage between combination meter harness connector terminals and ground.
Courtesy of NISSAN MOTOR CO., U.S.A.
TERMINALS & IGNITION SWITCH POSITIONTerminals Ignition switch position (+) (-) OFF ACC ON Connector Terminal M24 1 Ground 0V Battery voltage Battery voltage 8 Battery voltage Battery voltage Battery voltage 24 0V 0V Battery voltage
OK or NG
OK: GO TO 3.
NG: Check the harness for open between combination meter and fuse.
- CHECK GROUND CIRCUIT
- Turn ignition switch OFF.
- Check continuity between combination meter harness connector terminal and ground.
Courtesy of NISSAN MOTOR CO., U.S.A.
TERMINALS CONTINUITY REFERENCE CHARTTerminals Continuity (+) (-) Connector Terminal M24 17 Ground Yes
OK or NG
OK: Inspection End.
NG: Repair harness or connector.