Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Nissan-Datsun >> 2004 >> Quest SL >> Repair and Diagnosis >> External Pages >> Different car >> Section 502 (IPDM E/R (Intelligent Power Distribution Module Engine Room)) >> IPDM E/R (Intelligent Power Distribution Module Engine Room) >> IPDM E/R Power/Ground Circuit Inspection

IPDM E/R Power/Ground Circuit Inspection

WARNING: This page is about a different car, the 2004 Nissan Altima. However, it is still accessible from the selected car via links, so may be relevant.
  1. FUSE AND FUSIBLE LINK INSPECTION 
    • Check that the following fusible links or IPDM E/R fuses are not blown.
      FUSE AND FUSIBLE LINK INSPECTION

      Terminal No. Signal name Fuse, fusible link No.
      1, 2, 15, 16 Battery power b, d, k, l

    OK or NG

    1. OK : GO TO 2.
    2. NG : Replace fuse or fusible link.
  2. POWER CIRCUIT INSPECTION 
    1. Disconnect IPDM E/R harness connector E120.
    2. Check voltage between IPDM E/R harness connector E120 terminals 1 (R), 2 (B/Y) and ground.

      Battery voltage should exist. 

    OK or NG

    1. OK : GO TO 3.
    2. NG : Repair or replace IPDM E/R power circuit harness.
      Fig 1: IPDM E/R Power Circuit Harness Test
      G02888478Courtesy of NISSAN MOTOR CO., U.S.A.
  3. GROUND CIRCUIT INSPECTION 
    1. Disconnect IPDM E/R harness connectors E121 and E124.
    2. Check continuity between IPDM E/R harness connector E121 terminal 50 (B), E121 terminal 60 (B), E124 terminal 38 (B) and ground.

      Continuity should exist. 

    OK or NG

    1. OK : Inspection End.
    2. NG : Repair or replace ground circuit harness of IPDM E/R.
      Fig 2: IPDM E/R Ground Circuit Continuity Test
      G02888479Courtesy of NISSAN MOTOR CO., U.S.A.