Turn Signal Operation: Notes
WARNING: This page is about a different car, the 2006 Nissan Titan. However, it is still accessible from the selected car via links, so may be relevant.
When the ignition switch is in the ON or START position, power is supplied
- through 10A fuse (No. 59, located in the fuse and relay box)
- to BCM terminal 38, and
- through 10A fuse [No. 14, located in the fuse block (J/B)]
- to combination meter terminal 24.
Ground is supplied
- to BCM terminal 67 and
- to combination meter terminal 17
- through grounds M57, M61 and M79.