Circuit Operation
- A/T control relay (terminal 1) receives battery positive voltage through a junction block.
- The PCM (terminal 50) applies voltage to energize the A/T control relay (terminal 4). With the A/T control relay energized, system voltage is applied to the PCM (terminals 77 and 89).