Load compensation inspection
- Warm up the engine to normal operating temperature and idle it.
- Connect the WDS or equivalent to DLC-2.
- Select the following PID.
- RPM
- Turn the electrical loads on and verify that the engine speed is within the specification. (See ENGINE TUNE-UP
.)
- If not as specified, carry out following:
- Headlight switch inspection
- A/C switch inspection
- P/S pressure switch inspection
- IAC valve inspection
- Fan switch inspection
- Cooling fan motor inspection
- Rear window defroster inspection
- If not as specified, carry out following: