Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Mazda >> 1996 >> 626 ES, Standard >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 8 (Engine Controls - Remove/Install/Overhaul - 2.0L) >> Ignition System >> Distributor >> Removal & Installation

Removal & Installation

WARNING: This page is about a different variant/trim than selected.

Disconnect negative battery cable. Move any hoses, wiring or components interfering with distributor removal. Reference mark high tension wires to distributor cap and disconnect all wiring from distributor. Remove distributor cap. Remove hold-down bolt and distributor. To install, reverse removal procedure. Align No. 1 cylinder and distributor matching marks to Top Dead Center. After installing the distributor, connect the high-tension leads and distributor connector. Tighten locknut/bolts to specified torque 14-18 ft-lb (19-25 N.m). See Fig 1. Adjust ignition timing. See D - ADJUSTMENTS - 2.0L article.

Fig 1: Camshaft/Distributor Matching Marks
G00181147Courtesy of MAZDA MOTORS CORP.