Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Lincoln >> 2006 >> Town Car Protection Series, 4.6 W >> Repair and Diagnosis >> Brakes >> Traction Control >> Vehicle Dynamic Systems >> Diagnosis And Testing >> Anti-Lock Control >> Pinpoint Tests >> Pinpoint Test G: Poor Vehicle Tracking During Anti-Lock Function >> Normal Operation

Normal Operation

Fused battery voltage is provided to the anti-lock brake (ABS) module from battery junction box fuses 109 (20A) and 106 (40A) along circuits 483 (RD) and 601 (LB/PK) respectively. Fused ignition voltage is provided from central junction box (CJB) fuse 17 (10A) along circuit 88 (BK/WH). When necessary, the ABS module supplies voltage to the hydraulic control unit (HCU) assembly and the pump motor is activated. The ABS module is provided a ground along circuit 57 (BK) and the hydraulic pump motor is provided a ground internally through the HCU.