Preparation For Testing
- Attach Low and High side gauges.
- Start engine and allow it to warm up.
- Set system to COOL and blower to HIGH.
- Open car doors and hood.
- Run at fast idle for 2-3 minutes.
- Attach Low and High side gauges.
- Start engine and allow it to warm up.
- Set system to COOL and blower to HIGH.
- Open car doors and hood.
- Run at fast idle for 2-3 minutes.