Installation [09/2015 - ]: Procedure
- INSTALL ID CODE BOX (IMMOBILIZER CODE ECU)
- INSTALL AIR CONDITIONING UNIT
(Refer to INSTALLATION [09/2015 - ] )
- INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
(Refer to INSTALLATION [09/2015 - ] )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [09/2015 - ] ).
- INSTALL COWL TOP VENTILATOR LOUVER RH
Refer to PROCEDURE - Step 15
- REGISTER ECU CODE
(Refer to REGISTRATION [09/2015 - ] )
- CHECK SRS WARNING LIGHT
(Refer to DIAGNOSIS SYSTEM [09/2015 - ] )