On-Vehicle Inspection [08/2015 - ]: Procedure
- INSPECT CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY
- Connect the Techstream to the DLC3.
- Start the engine.
- Turn the Techstream on.
- Enter the following menus: Powertrain / Engine / Active Test / Control the Intake VVT OCV Duty Ratio Bank 1 / Data List / Intake VVT Change Angle Bank 1.
Powertrain > Engine > Active Test
Active Test Display Control the Intake VVT OCV Duty Ratio Bank 1 Data List Display Intake VVT Change Angle Bank 1 - Read the Data List while performing the Active Test with the engine idling.
OK
Techstream Operation Intake VVT Change Angle Bank 1 -100% to 100% Varies by 70° FR or more