Installation [09/2014 - ]: Procedure
- INSTALL ID CODE BOX (IMMOBILISER CODE ECU)
- INSTALL INSTRUMENT PANEL REINFORCEMENT ASSEMBLY WITH AIR CONDITIONING UNIT ASSEMBLY
- Install the instrument panel reinforcement assembly with air conditioning unit assembly (Refer to INSTALLATION [09/2014 - 10/2015] Refer to INSTALLATION [10/2015 - ] ).
- REGISTER ECU CODE
- Register the ECU code (Refer to REGISTRATION [09/2014 - 10/2015] or refer to REGISTRATION [10/2015 - ] ).