Installation [08/2014 - ]: Procedure
- INSTALL COMBINATION SWITCH ASSEMBLY
- Engage the 2 claws to install the transmission shift main switch.
- Put the 2 guides in position.
- Install the position indicator housing assembly to the combination switch assembly with the 2 screws.
Torque: 0.8 N*m (8 kgf*cm, 7 in.*lbf)
- Connect each connector.
- Engage the clamp.
- Engage the 2 guides and 6 claws to install the combination switch assembly.
- INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
Refer to PROCEDURE - Step 18
- INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
Refer to PROCEDURE - Step 22
- INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH
Refer to PROCEDURE - Step 24
- INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH
Refer to PROCEDURE - Step 23
- INSTALL LOWER CENTER INSTRUMENT PANEL FINISH PANEL
Refer to PROCEDURE - Step 7
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See article. Refer to INITIALIZATION [08/2014 - 08/2015] Refer to INITIALIZATION [08/2015 - ] ).
- INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE
Refer to PROCEDURE - Step 69
- INSTALL DECK FLOOR BOX RH
Refer to PROCEDURE - Step 70
- INSTALL REAR NO. 3 FLOOR BOARD
Refer to PROCEDURE - Step 71
- INSTALL REAR DECK FLOOR BOX
Refer to PROCEDURE - Step 72
- INSTALL REAR NO. 2 FLOOR BOARD
Refer to PROCEDURE - Step 73