Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Lexus >> 2017 >> CT 200h Base >> Repair and Diagnosis >> Hybrid/Electric Powertrain >> Battery Management Systems >> Hybrid Battery Control System - Service Information >> Battery Smart Unit >> Installation [08/2014 - ] >> Procedure

Installation [08/2014 - ]: Procedure

  1. INSTALL BATTERY SMART UNIT 
    WARNING:

    Be sure to wear insulated gloves and protective goggles.

    1. Install the battery smart unit with the 2 bolts.

      Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf) 

    2. Connect the 3 connectors.
      NOTE:

      The connectors should be connected securely.

  2. INSTALL HYBRID BATTERY JUNCTION BLOCK ASSEMBLY 

    (See article. Refer to INSTALLATION [08/2014 - ] )