Installation [08/2014 - ]: Procedure
- INSTALL VENTILATION VALVE SUB-ASSEMBLY
- Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.
Adhesive
Toyota genuine adhesive 1324, three bond 1324 or equivalent
- Using a ball joint lock nut wrench (22 mm), install the ventilation valve sub-assembly.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
NOTE:Use the torque value compensation formula to calculate the torque value for use when a torque wrench is combined with a tool such as a ball joint lock nut wrench (See article. Refer to PRECAUTION [08/2014 - ] ).
- Install the ventilation hose to the ventilation valve sub-assembly.
- Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.
- INSTALL NO. 1 ENGINE UNDER COVER
- INSTALL AIR CLEANER CASE
Refer to PROCEDURE - Step 3
- INSTALL INLET AIR CLEANER
Refer to PROCEDURE - Step 69
- INSTALL WATER HOSE HOSE CLAMP
Refer to PROCEDURE - Step 70
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY
Refer to PROCEDURE - Step 6
- INSTALL NO. 2 CYLINDER HEAD COVER
Refer to PROCEDURE - Step 99