Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Lexus >> 2008 >> LS 600hL >> Repair and Diagnosis >> Accessories & Equipment >> Cruise Control Systems >> Cruise Control >> Cruise Control System >> TC and CG Terminal Circuit >> Inspection Procedure

Inspection Procedure

  1. CHECK HARNESS AND CONNECTOR (DLC3 - HYBRID VEHICLE CONTROL ECU AND BODY GROUND) 
    1. Disconnect the A75 ECU connector.
    2. Measure the resistance according to the value (s) in the table below.

      Standard resistance

      TESTER CONNECTION SPECIFIED CONDITION CHART

      Tester Connection Condition Specified Condition
      L31-13 (TC) - A75-24 (TC) Always Below 1 Ω
      L31-4 (CG) - Body ground Always Below 1 Ω
      L31-13 (TC) - Body ground Always 10 kΩ or higher
      Fig 1: Identifying A75 Hybrid Vehicle Control ECU & L31 DLC3 Connectors
      G05776014Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      NG: REPAIR OR REPLACE HARNESS OR CONNECTOR 

    OK: PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE  (See PROBLEM SYMPTOMS TABLE ).