Inspection Procedure
- PERFORM ACTIVE TEST USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Check the CRUISE main indicator light by using the Active Test.
Combination meter
TESTER DISPLAY CHARTTester Display Test Part Control Range Diagnostic Note Indicat. Lamp Cruise CRUISE main Indicator fight Indicator light BLINK / OFF - OK:
Indicator light comes on / goes off.
NG : GO TO COMBINATION METER SYSTEM
OK : Go to next step.
- READ VALUE USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG) and turn the Techstream main switch ON.
- Check the Data List for proper functioning of the CRUISE main indicator light.
ECM (Cruise control):
MEASUREMENT ITEM / RANGE CHARTTester Display Measurement Item / Range Normal Condition Diagnostic Note CCS Indicator M-CPU CRUISE main indicator signal (Main CPU) / ON or OFF ON: "CCS READY" ON
OFF: "CCS READY" OFF- OK:
When cruise control main switch operation is performed, the result will be same as above.
NG : REPLACE ECM
OK : PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE