Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Lexus >> 2007 >> LS 460L >> Repair and Diagnosis >> Accessories & Equipment >> Communication Devices >> Cellular Communication >> LEXUS Link System >> DTC 4-6 SERVICES, PHONE or PTT Button has Connection Error >> Inspection Procedure

Inspection Procedure

  1. CHECK HARNESS AND CONNECTOR (MAYDAY ECU - MAP LIGHT (MAYDAY SWITCH)) 
    1. Disconnect the R23 ECU connector.
    2. Disconnect the X4 map light connector.
    3. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      MAYDAY ECU - MAP LIGHT (MAYDAY SWITCH)

      Tester Connection Condition Specified Condition
      R23-13(SIG2)-X4-31 (SIG2) Always Below 1 Ω
      R23-12 (SIG-) - X4-32 (GND3) Always Below 1 Ω
      Fig 1: Identifying R23 ECU Connector And X4 Map Light Connector
      G04945812Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    NG: REPAIR OR REPLACE HARNESS OR CONNECTOR THEN CLEAR HISTORIC DTC 

    OK: GO TO NEXT STEP 

  2. INSPECT MAP LIGHT ASSEMBLY (MAYDAY SWITCH) 
    1. Remove the map light for standard body (see REMOVAL ) or long body (see REMOVAL ).
    2. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      MAP LIGHT ASSEMBLY (MAYDAY SWITCH)

      Tester Connection Condition Specified Condition
      31 (SIG2) - 32 (GND3) SERVICES button is pressed 305 to 313 Ω
      31 (SIG2) - 32 (GND3) PHONE button is pressed 812 to 831 Ω
      31 (SIG2) - 32 (GND3) PTT button is pressed 1811 to 1848 Ω
      Fig 2: Inspecting Map Light Assembly (Mayday Switch)
      G04945809Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    NG: REPLACE MAP LIGHT ASSEMBLY (MAYDAY SWITCH) THEN CLEAR HISTORIC DTC 

    OK: REPLACE MAYDAY ECU TOGETHER WITH MAYDAY BATTERY AND THEN PERFORM REGISTRATION