Repair Procedures: Removal
WARNING:
- Be sure to read and follow the "GENERAL SAFETY INFORMATION & CAUTION " before doing any work related with the high voltage system. Failure to follow the safety instructions may result in serious electrical injuries.
- Be sure to shut off the high voltage circuit according to the "High Voltage Shut-off Procedures" before doing any work related with the high voltage system to avoid serious electrical injuries.
- Shut off the high voltage circuit.
(Refer to Dual Clutch Transmission System - " HIGH VOLTAGE SHUT-OFF PROCEDURES ")
- Drain the coolant of hybrid cooling system.
(Refer to Hybrid Motor System - " COOLANT ")
- Remove the hybrid power control unit (HPCU) assembly.
(Refer to Hybrid Control System - " HYBRID POWER CONTROL UNIT ")
- Disconnect the TCM connector (A) and ECM connector (B).
- Remove the TCM (A) and ECM (B).
Tightening torque:
9.8 - 11.8 N.m (1.0 - 1.2 kgf.m, 7.2 - 8.7 lb.ft)
- Remove the HPCU tray (C) after removing the nut (A) and wiring mounting clips (B).
Tightening torque:
(A) 10.8 - 13.7 N.m (1.1 - 1.4 kgf.m, 8.0 - 10.1 lb.ft)
(C) 21.6 - 23.5 N.m (2.2 - 2.4 kgf.m, 15.9 - 17.4 lb.ft)
- Disconnect the gear actuator motor connector (A) and gear actuator solenoid connector (B).
- Remove the gear actuator assembly after loosening bolts (A, B).
Tightening torque:
- 19.6 - 26.5 N.m (2.0 - 2.7 kgf.m, 14.5 - 19.5 lb.ft)
- 9.8 - 11.8 N.m (1.0 - 1.2 kgf.m, 7.2 - 8.7 lb.ft)