Electrical Circuit Inspection Procedure
- Check Open Circuit
- Procedures for Open Circuit
- Continuity Check
- Voltage Check
If an open circuit occurs (as seen in [Fig 1]), it can be found by performing 2 (Continuity Check Method) or Step 3 (Voltage Check Method) as shown below.
- Continuity Check MethodNOTE: When measuring the resistance, lightly shake the wire harness vertically and horizontally.
Specification (Resistance)
1Ω or less → Normal Circuit
1MΩ or Higher → Open Circuit
- Disconnect connectors (A) and (C), and measure the resistance between connectors (A) and (C) as shown in [Fig 2].
In [Fig 2], the measured resistances of lines 1 and 2 are higher than 1 MΩ and below 1Ω respectively. Specifically, an open circuit is in line 1.
(Line 2 is normal.) To find the exact broken point, check sub line of line 1 as described in the next step.
- Disconnect connector (B), and measure the resistances between connectors (C) and (B1) and between (B2) and (A) as shown in [Fig 3]. In this case the measured resistance between connector (C) and (B1) is higher than 1MΩ and the open circuit is between terminal 1 of connector (C) and terminal 1 of connector (B1).
- Disconnect connectors (A) and (C), and measure the resistance between connectors (A) and (C) as shown in [Fig 2].
- Voltage Check Method
- With each connector still connected, measure the voltage between the chassis ground and terminal 1 of each connectors (A), (B) and (C) as shown in [Fig 4].
The measured voltages of each connector are 5V, 5V and 0V respectively. So the open circuit is between connectors (C) and (B).
- Procedures for Open Circuit
- Check Short Circuit
- Test Method for Short to Ground Circuit
- Continuity Check with Chassis Ground
If short to ground circuit occurs as shown in [Fig 5], the broken point can be found by performing 2 (Continuity Check Method with Chassis Ground) as shown below.
- Continuity Check Method (with Chassis Ground)NOTE: Lightly shake the wire harness above and below, or from side to side when measuring the resistance.
Specification (Resistance)
1Ω or less → Short to Ground Circuit
1MΩ or Higher → Normal Circuit
- Disconnect connectors (A) and (C), and measure the resistance between connector (A) and Chassis Ground as shown in [Fig 6].
The measured resistances of lines 1 and 2 in this example are below 1Ω and higher than 1 MΩ respectively. Specifically, a short to ground circuit is in line 1. (Line 2 is normal.) To find the exact broken point, check the sub line of line 1 as described in the following step.
- Disconnect connector (B), and measure the resistance between connector (A) and chassis ground, and between (B1) and chassis ground as shown in [Fig 7].
The measured resistance between connector (B1) and chassis ground is 1Ω or less. The short to ground circuit is between terminal 1 of connector (C) and terminal 1 of connector (B1).
- Test Method for Short to Ground Circuit