Signal Circuit Inspection
■ Check Open or Short in signal circuit
- IG KEY "OFF".
- Disconnect IATS connector.
- IG KEY "ON" & ENG "OFF"
- Measure voltage between signal terminal of IATS harness connector and chassis ground.
Specification : Approx. 5V
- Is the measured voltage within specification?
YES
- Go to next procedure.
NO
- Check for Open or Short in signal circuit. Repair as necessary and then go to "Verification of Vehicle Repair " procedure.
■ Check Short to ground in signal circuit
- IG KEY "OFF".
- Disconnect IATS and ECM/PCM connector.
- Measure resistance between signal and ground terminal of IATS harness connector.
Specification : Infinite
- Is the measured resistance within specification?
YES
- Go to "Ground Circuit Inspection " procedure.
NO
- Check for short to ground in signal circuit. Repair as necessary and then go to "Verification of Vehicle Repair " procedure.