Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Kia >> 2016 >> Cadenza Base >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System Diagnosis (3 Of 3) >> DTC U1112: LIN Communication Error >> Wiring Inspection >> Signal Circuit Inspection

Signal Circuit Inspection

■ Check open in harness 

  1. IG "OFF". Disconnect battery sensor and PCM connector.
  2. Check resistance between LIN terminal of battery sensor harness Connector and PCM harness connector.

    Specification:  Below 1.0Ω

  3. Is the measured resistance within specification?

    YES 

    • Go to "Check short to battery in harness" below.

    NO 

■ Check short to battery in harness 

  1. IG "OFF". Disconnect battery sensor and PCM connector.
  2. IG "ON"
  3. Measure the voltage between LIN terminal of battery sensor harness connector and chassis ground.

    Specification:  Approx. 0V

  4. Is the measured voltage within specification?

    YES 

    • Go to "Check short to ground in harness" below.

    NO 

■ Check short to ground in harness 

  1. IG "OFF". Disconnect battery sensor and PCM connector.
  2. Check resistance between LIN terminal of battery sensor harness Connector and chassis ground.

    Specification:  Infinity

  3. Is the measured resistance within specification?

    YES 

    • Go to "Component Inspection" below.

    NO