Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Kia >> 2009 >> Spectra5 2.0 2, Standard >> Repair and Diagnosis >> Engine Performance >> System >> DTC Troubleshooting Procedures (1 Of 2) >> P0032: Ho2S Heater Control Circuit High (Bank1/Sensor1) >> Control Circuit Inspection

Control Circuit Inspection

  1. Check for open in control harness.
    1. Ignition "OFF".
    2. Disconnect HO2S and PCM connectors
    3. Measure resistance between terminals 6 of the HO2S heater harness connector and 8 of the PCM harness connector

      Specification: Approx 0Ω

      Fig 1: Measuring Resistance Between Terminals 6 Of HO2S Heater Harness Connector And 8 Of PCM Harness Connector
      G06414809Courtesy of KIA MOTORS AMERICA, INC.
    4. Is resistance within the specification?

      YES 

      • Go to step  2.

      NO 

  2. Check for short to battery in control circuit.
    1. Reconnect the PCM connector.
    2. Ignition "ON" & Engine "OFF"
    3. Measure voltage between terminal 3 of the HO2S heater harness connector and chassis ground.

      Specification: Approx 0V

      Fig 2: Measuring Voltage Between Terminal 3 Of HO2S Heater Harness Connector And Chassis Ground
      G06414810Courtesy of KIA MOTORS AMERICA, INC.
    4. Is voltage within the specification?

      YES 

      NO