Control Circuit Inspection
- Check for short to ground in harness.
- Ignition "OFF"
- Disconnect CCV connector
- Measure resistance between terminal "1" of CCV harness connector and chassis ground.
Specification: Infinite
- Is the measured resistance within specifications?
YES
- Go to step 2.
NO
- Check short to ground in signal harness
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure.
- Check for open in harness
- Ignition "OFF"
- Disconnect CCV and ECM connector
- Measure resistance between terminal "1" of CCV harness connector and terminal "37" of ECM harness connector (C144-A).
Specification: Approx. below 1Ω
- Is the measured resistance within specifications?
YES
- Go to "COMPONENT INSPECTION " procedure.
NO
- Check open in harness between CCV connector and ECM connector.
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure.