Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Jeep >> 2021 >> Grand Cherokee L Laredo, AWD >> Repair and Diagnosis >> General Information >> OEM General Information >> Standard Driver Assistance System (Service Information) >> Description And Operation >> Parallel And Perpendicular Parking Assistance System >> Auxiliary Switch Bank Module 2 (ASBM2)

Auxiliary Switch Bank Module 2 (ASBM2)

AUXILIARY SWITCH BANK MODULE 2 (ASBM2)

Refer to COMPONENT INDEX .

The ASBM2 sends the request signal to the BCM with the intent of sending the park assist ON/OFF switch state. The ASBM2 receives a gated BCM LED control signal with the intent of:

The park assist LED is controlled by the PAM. The PAM sends a signal to control the status of the switch and a signal to request the ASBM to display the appropriate LED indication of either ON, OFF or blinking. In the event that the light is blinking, this indicates a fault in the park assist system. The PAM will command the switch to blink for five seconds. Once the five second timer expires the PAM requests a continuous light.