Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Jeep >> 2019 >> Grand Cherokee Trackhawk >> Repair and Diagnosis >> External Pages >> Different car >> Section 163 (Power Distribution) >> Center, Power Distribution (PDC) >> Installation >> Installation - PDC Assembly

Installation - PDC Assembly

WARNING: This page is about a different car, the 2018 Jeep Grand Cherokee. However, it is still accessible from the selected car via links, so may be relevant.
  1. Position the upper PDC tray to the PDC base in the engine compartment.
  2. Connect the bulkhead connectors located in the base of the PDC to the upper PDC tray bottom.
  3. Secure the PDC tray to the PDC base.
  4. Connect power feeds to their proper PDC posts.
  5. Install the PDC cover onto the PDC assembly.
  6. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector to the negative battery cable.