Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Jeep >> 2018 >> Grand Cherokee Trackhawk >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 34 (5.7L Engine (Service Information)) >> Lubrication >> Control Valve, Oil Intake >> Installation

Control Valve, Oil Intake: Installation

WARNING: This page is about a different variant/trim than selected.
GC0144407Courtesy of CHRYSLER GROUP, LLC
NOTE:

Ensure that the O-ring is fully seated into the cylinder block.

  1. Position the VVTS (3) into the cylinder block.
  2. Securely tighten the VVTS retaining bolt (2).
  3. Connect the VVTS electrical connector (1).
  4. Install the intake manifold. Refer to MANIFOLD, INTAKE, INSTALLATION .